鋼波紋管根據(jù)以往經(jīng)歷,施工現(xiàn)場發(fā)現(xiàn),管體頂部還沒停止時(shí),就將鋼波紋涵管上下游的八字墻、一字墻施工完成了,這種施工方式將存在填土結(jié)束后端墻裂縫的弊端,因波紋管在填土過程中存在管壁變形,一般變形量為管徑±0.5-2%,當(dāng)然此變形數(shù)值和管側(cè)填土的密實(shí)度有很大關(guān)系。
但填土停止后波紋管不再變形,建成后行車動載對其影響很微小,(管壁的變形為0.06-0.15cm)。因此,為避免端墻裂縫,可采取以下兩種措施。根底做好后,上下游的八字墻、一字墻根底和砂礫根底上頂面標(biāo)高一致即可,開始拼裝鋼波紋涵管,在管體裝置就位結(jié)束后,可采取不施工端墻。
而將波紋管的填土填至路頂面標(biāo)高十五日后再施工端墻。也便是波紋管停止了管壁的變形后。鋼波紋涵管裝置就位結(jié)束后,可以將兩端端八字墻、一字墻施工至與波紋管管頂高度一致時(shí)就不再施工,波紋管管頂部填土填至路基規(guī)劃標(biāo)高再夯實(shí)。
The end wall will be constructed 15 days after the corrugated pipe is filled to the road top elevation. That is, after the bellows stops the deformation of the pipe wall. After the installation of steel corrugated culvert is completed, the splayed wall and splayed wall at both ends can be constructed to the same height as the top of corrugated pipe. The top of corrugated pipe can be filled to the planned elevation of subgrade and then compacted.
否則應(yīng)重新復(fù)核,以確認(rèn)測到的扭力矩值是否滿足要求。鋼波紋管在出廠前應(yīng)嚴(yán)格按鋼波紋涵管加工檢驗(yàn)規(guī)范進(jìn)行,并進(jìn)行必要的預(yù)拼裝。鋼波紋涵管現(xiàn)場拼裝,有必要嚴(yán)格按照規(guī)劃以及鋼波紋涵管施工裝置規(guī)范的要求施工。
現(xiàn)場施工中土建部分檢驗(yàn)規(guī)范可參照交通部《公路工程質(zhì)量檢驗(yàn)評定規(guī)范》JTGF801-2004中有關(guān)規(guī)范,鋼波紋管外回填土的檢驗(yàn)可歸入路基工程之中。重量輕,裝置時(shí)不需要大型吊運(yùn)設(shè)備。軸向柔性好,敷設(shè)時(shí)對溝槽底部平坦度,堅(jiān)實(shí)度需求較低,接受裝置不當(dāng)所構(gòu)成的非正常應(yīng)力的能力強(qiáng)。http://strive2win.com/