為保證鋼波紋管的距離和順直,可用鋼筋支架對波紋管進(jìn)行點(diǎn)焊固定,防止?jié)仓艜r(shí)左右位移。管道鋪設(shè)后,出于其它原因造成管壁呈現(xiàn)局部損壞,當(dāng)損壞程度比較小時(shí),可經(jīng)過焊槍修補(bǔ)處理,如環(huán)向、縱向裂縫小于管周長的112或孔徑60mm的情況。
當(dāng)損壞程度大于這些數(shù)據(jù)時(shí),宜經(jīng)過換波紋管或基建筑檢查井、連接井等修補(bǔ)方法處理。雨期時(shí)節(jié)應(yīng)留意防止管材漂浮、位移等現(xiàn)象,當(dāng)管道裝置完畢沒有覆土遇到水泡情況時(shí),應(yīng)復(fù)測管底與管中心高程,并做好返工處理辦法。
鋼波紋管安置和線盒及預(yù)留洞處相協(xié)調(diào),管線盒盡可能安置在管間肋的位置。波紋管運(yùn)工作面后,鋪放前應(yīng)檢查管材的外形及管端的堵頭封堵是否嚴(yán)密,對變形或裂口處進(jìn)行修補(bǔ)。并對波紋管的外形和標(biāo)準(zhǔn)進(jìn)行檢查,按標(biāo)準(zhǔn)、型號分類平臥疊層堆放。
The placement of steel bellows shall be coordinated with wire box and reserved hole, and the wire box shall be placed at the position of ribs between pipes as far as possible. After the corrugated pipe is transported to the working face, the shape of the pipe and the sealing of the plug at the pipe end should be checked before laying, and the deformation or crack should be repaired. Check the shape and standard of the bellows, and stack them horizontally according to the standard and model.
依據(jù)放線位置進(jìn)行波紋管的鋪設(shè)裝置,在裝置過程中,應(yīng)在管頂襯托木板作維護(hù),不得直接踐踏波紋管。因波紋管底部砼層較薄,在裝置底部鋼筋時(shí),有必要安放并固定好墊塊或馬凳筋,以保證底部砼層的厚度。
一般將管拉結(jié)錨固在板底層鋼筋上,依據(jù)管徑巨細(xì),每0.8-1.0米管長錨固一次鐵絲,底筋的錨固可別離放兩條通長鋼筋做壓筋,然后用鐵絲將鋼筋與模板支架拉結(jié)錨緊。壓筋和拉結(jié)鐵絲的巨細(xì)、拉結(jié)錨固距離經(jīng)核算后確認(rèn)或由設(shè)計(jì)院給定。
在管材放入溝槽時(shí),應(yīng)依據(jù)施工設(shè)備、溝槽以及管徑巨細(xì),且鄙人管過程中應(yīng)留意不得與溝壁、溝底呈現(xiàn)劇烈磕碰現(xiàn)象,宜經(jīng)過適宜的吊車等機(jī)械平穩(wěn)下溝,一起吊裝時(shí)不得呈現(xiàn)穿心吊,應(yīng)少有兩個(gè)支撐吊點(diǎn)。為防止?jié)仓艜r(shí)波紋管上浮,將波紋管拉結(jié)錨固。http://strive2win.com/